REACH for McDonald's

REACH has been working with the McDonald's Contractors, Construction Managers, Kitchen Suppliers and Owners tailoring the REACH systems specifically for McDonald's applications.

029-0-2-R8M Hub

Handles the MAC unit. It has a 60a safety switch that replaces the one on the MAC unit. It supplies the connections for the walk-in cooler, walk-in freezer, rear ice machine and the multiplex.

029-12M-12M-12M Hub

Handles the 3 front ice machines. Has 3 disconnects and 3 line-sets that supply all the needs of the three machines.

029-12M-0-0 Hub

This Hub is to handle the rear ice machine in the event the placement of the ice machine requires the refrigerant line-set to be longer than 50 feet.

052-24 Deck Channel

This channel is for mounting the REACH to a wooden deck and truss system.

051-60 & 071-BJ

This channel and the mounting system are for mounting the REACH to a steel truss system.


Installations

In Progress

  • 1033 N Main St., Cloverdale, IN
  • 7340 W State Rd., Elwood, IN

Completed

McDonald Specific Applications

029-0-2-R8M
Hub 1g60 4rls2 /mcd
McDonald' Mac Unit
  • 1) 240v 60a 3p disconnect with 3/4" low voltage connectors
  • 3) liquid & suction line-set connectors
  • Submittal/Detail Sheet
    029-12M-12M-12M
    Hub 3g30 3rls2 /mcd
    Triple remote condensers
  • 3) 240v 30a 3p disconnects with low voltage connectors
  • 3) liquid & suction line-set connectors
  • Submittal/Detail Sheet
    029-12M-0-0
    Hub 1g30 & 1rls2 /mcd
    1200lb rear ice machine
  • 1) 240v 30a 3p disconnect with 3/4 low voltage connectors
  • 1) liquid & suction line-set
  • Submittal/Detail Sheet
    052-24
    Channel deck mount 24
    4" insulation & 20" access
    height=24" diameter=10-3/4"
    Submittal/Detail Sheet
    051-60
    Channel strut mount 60
    24" joists 3" deck 8" insulation & 20" access
    height=60" diameter=10-3/4"
    Submittal/Detail Sheet
    071-BJ
    Mount bar joist
    Mount strut channels to bar joists
    Bar-Joist or Rafter Mounting System
    Submittal/Detail Sheet

    Other Questions

    During our presentations to Owner/Operators, contractors and construction managers and assisting them with converting to the REACH System, we are occasionally asked for the status of corporate approval.

    We have been trying to get an answer to their question since the first project in early 2010 at Houma, LA, with no success.

    Excluding what we have been told, by those making efforts to convert to REACH, which we consider positive but unverifiable, we are still unable to pass along any information in that area.

    All we can do is rely on our marketing strategy of letting the REACH speak for itself and simply report that REACH has been installed on franchise and corporate owned stores with orders for more locations.